Bolted cement silo installed for a bulk powder handling project

Shandong Yuli Machinery Engineering Co., Ltd.

Storage Silos and Powder Handling Equipment

Tell us what you store and how it moves through your plant. We review bolted and welded silo options, screw conveyors, silo-top dust collectors and discharge accessories for your project.

Include the project country, material and any known dimensions, storage capacity or conveying rate.

Start with the required storage capacity

Capacity is the first filter. Material density, discharge height, site layout and destination determine the final silo dimensions and accessory package.

View bolted silo details
100T

Compact project storage

Common starting point for a single batching line or a smaller site footprint.

Review 100T selection
200T

Higher daily cement demand

For projects that need more storage between tanker deliveries or multiple production shifts.

Review 200T selection
500T

Large storage requirement

Requires a project-specific review of foundation loads, delivery method and discharge arrangement.

Review 500T selection

Equipment supplied around the silo

Choose the silo body first, then confirm the feeding, dust control and discharge package around the actual plant layout.

View all products
Bolted cement silos with support legs and access ladders

Bolted Cement Silo

Panelized silo body for container shipment and assembly at the destination site.

Product details
Screw conveyor for powder feeding

Screw Conveyor

Matched to outlet position, conveying distance and required capacity.

Product details
Silo top dust collector

Dust Control

Dust collector, pressure relief and loading accessories for pneumatic filling.

Product details

Application and delivery references

These images show typical installed, fabrication and loading conditions. Final scope is confirmed from the buyer's project information.

View all references
Multiple bolted cement silos during site installation
Multi-silo installationPanel assembly, supports and access arrangement
Curved silo sections prepared in the workshop
Fabrication preparationCurved sections and connection flanges
Cement silo components loaded for delivery
Loading preparationProtected parts arranged for transport
Yuli Machinery fabrication workshop

Fabrication, inspection and export preparation

Before quotation and production, the team checks material, capacity, outlet height, accessory scope and delivery method. Before dispatch, dimensions, coating, parts completeness and packing sequence are reviewed.

  • Plate cutting, forming and welding
  • Bolted panel and connection checks
  • Accessory matching and packing list
  • Loading photos and remote installation guidance

Before requesting a quotation

What information is needed first?

Required capacity, stored material, destination country, discharge height and the accessories or screw conveyor needed.

Can bolted silos be shipped by container?

Yes. The body is divided into panels and structural parts for packing, container loading and site assembly.

Can you provide installation support?

Foundation and assembly drawings, packing identification and remote technical guidance can be included according to the project scope.

Can I start with accessories or replacement parts?

Yes. Send the drawing, dimensions, quantity and material requirement for review.

Request a project-specific proposal

Send the core project data so we can review the relevant configuration instead of returning a generic catalog.

  • Company, country, product and capacity
  • Project city, quantity and purchase timing if known
  • Email or WhatsApp / Phone
  • Material, layout or accessory scope if available

YULI MACHINERY

Latest Updates

View all updates →
Bolted Silos and Delivery PlanningHow silo panelization, access and unloading requirements affect delivery planning.Read update →What to Prepare Before Requesting a Silo ProposalA practical checklist for discussing a silo project with an equipment supplier.Read update →Matching a Screw Conveyor to Your Silo LayoutReview conveying material, rate, route and connection points before selecting a screw conveyor.Read update →Dust Control Around a Silo Filling SystemKey questions to discuss when matching dust-control equipment to a silo and filling method.Read update →From Steel Plate to Silo ComponentsAn overview of common fabrication steps involved in preparing silo components.Read update →Preparing Equipment for Packing and LoadingWhat to consider when planning identification, packing and loading of silo equipment.Read update →Preparing for Silo Installation at SiteCoordinate foundations, access, delivery and equipment interfaces before installation.Read update →Storage and Discharge Considerations for Bulk MaterialsWhy stored material, capacity and discharge arrangements matter when discussing a silo.Read update →Silo Accessories and Connection DetailsA guide to discussing outlet valves, indicators, filter connections and other silo interfaces.Read update →A Practical Workflow for Your Storage Equipment ProjectFrom the first project conversation to a defined equipment proposal.Read update →